Skip to content

LV controller

The LV controller (LV) is the power-sequencing board. It enables low-voltage power to the other ECUs and subsystems, controls the inverter supply and shared inverter switch, and manages the status indicator, cooling and brake light.

It has its own power governor. This is not the same state machine as the front controller's global governor: the LV decides when power is available, and the FC decides when HV and torque are allowed.

Power governor

stateDiagram-v2
    [*] --> PWRUP_START
    PWRUP_START --> PWRUP_TSSI_ON: 50 ms
    PWRUP_TSSI_ON --> PWRUP_PERIPHERALS_ON: 50 ms
    PWRUP_PERIPHERALS_ON --> PWRUP_ACCUMULATOR_ON: 50 ms and FC seen on CAN
    PWRUP_ACCUMULATOR_ON --> PWRUP_MOTOR_CONTROLLER_PRECHARGING: all contactors open
    PWRUP_MOTOR_CONTROLLER_PRECHARGING --> PWRUP_SHUTDOWN_ON: motor controller not ON
    PWRUP_SHUTDOWN_ON --> DCDC_ON: accumulator RUNNING
    DCDC_ON --> POWERTRAIN_PUMP_ON: 100 ms
    POWERTRAIN_PUMP_ON --> POWERTRAIN_FAN_ON: 100 ms
    POWERTRAIN_FAN_ON --> READY_TO_DRIVE: fan at setpoint or 10 s
    DCDC_ON --> SHUTDOWN_PUMP_OFF: all contactors open
    POWERTRAIN_PUMP_ON --> SHUTDOWN_PUMP_OFF: all contactors open
    POWERTRAIN_FAN_ON --> SHUTDOWN_PUMP_OFF: all contactors open
    READY_TO_DRIVE --> SHUTDOWN_PUMP_OFF: all contactors open
    SHUTDOWN_PUMP_OFF --> SHUTDOWN_FAN_OFF: 50 ms
    SHUTDOWN_FAN_OFF --> PWRUP_ACCUMULATOR_ON: 50 ms
State Main action Leaves when
PWRUP_START Everything off; FC, IMU/GPS, pumps and shutdown circuit low 50 ms
PWRUP_TSSI_ON TSSI enabled 50 ms
PWRUP_PERIPHERALS_ON FC and IMU/GPS power on 50 ms and any LvCommand received
PWRUP_ACCUMULATOR_ON Accumulator electronics enabled BMS says all contactors are open
PWRUP_MOTOR_CONTROLLER_PRECHARGING Inverter supply enabled Motor-controller state is not ON
PWRUP_SHUTDOWN_ON Shutdown circuit enabled Accumulator reports RUNNING
DCDC_ON DCDC control is currently commented out 100 ms
POWERTRAIN_PUMP_ON Both cooling pumps on 100 ms
POWERTRAIN_FAN_ON Fan setpoint 100% At setpoint or 10 s
READY_TO_DRIVE No new action; LV power is ready All contactors open
SHUTDOWN_PUMP_OFF Pumps off 50 ms
SHUTDOWN_FAN_OFF Fan setpoint 0% 50 ms, then back to accumulator startup

READY_TO_DRIVE means the LV power sequence is ready. It does not grant motor torque; that is the FC global governor's decision.

SHUTDOWN_DRIVER_WARNING and SHUTDOWN_COMPLETE exist in the DBC but have no active incoming path in this revision.

Modules

Module Responsibility
Accumulator Enables accumulator electronics; reads contactor feedback; reports all-open/running
Motor_Controller Controls inverter precharge, main supply and shared switch; reports its state and switch position
TSSI Red/green status indicator; reads IMD and BMS fault inputs; red flashes on fault
Fans PWM ramp for powertrain cooling; enable outputs are currently forced low
HSD Six high-side drivers, 14 current-sense channels; sets HsdOvercurrent
Brake light Mirrors LvCommand.BrakeLightEnable to a GPIO; defaults on if no command
Suspension Reads rear travel sensors 3 and 4 and sends SuspensionTravel34
DCDC Low-voltage DC/DC measurement and control; not called by the current application
Scheduler Fixed-period task table for 100 Hz, 10 Hz and 1 Hz work

Inverter supply and switch

The motor-controller module has its own small state machine:

OFF → PRECHARGING (2 s) → PRECHARGING_HANDOFF (50 ms) → ON

It drives three GPIOs: precharge enable, main supply enable and the shared inverter switch. The switch follows InverterSwitchCommand.CloseInverterSwitch from the FC; if no command has been received, the switch is opened.

GetSwitchClosed() returns the requested software value, not an independent physical switch feedback. The FC treats this as the acknowledgment that lets the motors enter RUNNING.

Outputs

Output Purpose
Front-controller power Powers the FC
IMU/GPS power Powers navigation peripherals
Accumulator electronics power Powers the BMS/accumulator electronics
Shutdown-circuit enable Arms the hardware shutdown path
Inverter precharge, main supply and switch Brings the inverters online
Cooling pump 1/2, fan 1/2, fan PWM Powertrain cooling
TSSI enable, red and green High-voltage status indicator
Brake light Driver brake lamp
HSD enable/select lines Multiplexed current sensing
VICOR enable DC/DC control (present but unused by the application)

Scheduling and boot status

The LV application is not executable as written

In this revision main() does not call Initialize(), so the HAL, clocks, GPIO, ADC, CAN and timer setup are skipped. The scheduler is also called once with a timestamp that is never refreshed, so registered tasks cannot continue on advancing time. The state diagram above describes the intended governor logic, not a verified boot on hardware.

Constructor-order issues also affect the fan PWM and motor-controller enable lines.

Even with a working scheduler, PWRUP_MOTOR_CONTROLLER_PRECHARGING advances while the motor-controller state is not ON, so it does not wait for the inverter precharge to complete.